During weekends 52/01 ASH Pway teams worked with our highly valued client Keltbray Rail to remove over 100 Pan 8s & life expired concrete sleepers at New Cross station replacing the old sleepers with EG49s/PAN11s & EG53s.
The works were undertaken to remove wets spots on both the Up & Dn Kent Fast lines, to enable a long term TSR to be removed, the TSR was successfully removed and the line opened at line speed by ASH Track Hand back engineer